DELHI MEERUT RRTS CORRIDOR PROGRESS UPDATE 2020 | MEGA PROJECTS IN INDIA 2020 ????????

11 Просмотры
Издатель
DELHI MEERUT RRTS CORRIDOR PROGRESS UPDATE 2020 | MEGA PROJECTS IN INDIA 2020 ????????

???????????????????????????????????? ???????? ???????????????????????? ???????????????????????????? ????????????????:-

???????????????????????? ???????? ????????????????????????????????????:-


Delhi–Meerut Regional Rapid Transit System (Delhi–Meerut RRTS) is an km long, under-construction, semi-high speed rail corridor connecting Delhi-Ghaziabad-Meerut. It is one of the three rapid-rail corridors planned under Phase-I of Regional Rapid Transport System (RRTS) project of National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h ( mph), the distance between Delhi and Meerut will be covered in around 55 min.

The corridor would be beneficial for the development of the region and help connect the large number of townships and centres of economic activity that are already planned along this corridor.

Length = 82 km

Number of RRTS Stations =16

Number of additional Stations for Meerut MRTS = 5

Of the entire length, km ( mi) is elevated, km ( mi) is underground and km ( mi) will be at grade for connections to two depots that will come up at Duhai, Ghaziabad and Modipuram, Meerut. In densely populated areas of Delhi and Meerut, the route will be underground, including that of the river entire route is designed for a maximum speed of 180 km/h ( mph) and the operating speed will be 160 km/h ( mph).Average speed (including all the stops) will come around 100 km/h ( mph).

The Delhi-Meerut corridor starts from Sarai Kale Khan station in Delhi. The corridor will pass through areas of Delhi, Ghaziabad and Meerut, terminating at Modipuram in Meerut.

Hazrat Nizamuddin Sarai Kale Khan will also become a transit hub with the presence of Hazrat Nizamuddin metro station, Sarai Kale Khan ISBT and the Hazrat Nizamuddin railway station in vicinity.

The km ( mi) long Sahibabad - Meerut South section, including Duhai Depot, is expected to become operational by January 2023, the km ( mi) Hazrat Nizamuddin - Sahibabad in January 2024 and the remaining km ( mi) Meerut South - Modipuram in July 2024.

There will be a total of 16 stations Multimodal transport hubs for integration with existing transportation such as Delhi Metro, Indian Railways, UPSRTC are planned at Anand Vihar, Sahibabad and Shaheed Sthal stations.

Indian Train Man
Sanskar Sharma
delhi meerut rapid rail corridor
delhi meerut rrts corridor
delhi meerut rrts
delhi meerut rrts corridor work update
delhi meerut rrts update
delhi meerut rrts project
delhi meerut rrts stations
rrts
delhi meerut corridor
delhi meerut rapid rail
delhi meerut rrts route
delhi meerut rrts latest update
delhi meerut rrts corridor work up
meerut metro
delhi meerut rail
delhi meerut rapid train
delhi meerut rapid metro

#delhi #rrts #indianrailways
Категория
Комедии онлайн
Комментариев нет.
Яндекс.Метрика